  • State what sets the pace of a CO₂ storage project: the pore volume sets how much it can hold and the pressure limit how fast
  • Find the pressure limit at the crest from the minimum horizontal stress and a margin, and the rate that holds the crest there
  • Tell the oil's pore volume from the capacity above the spill point, and say which one the project fills
  • Follow the trapping after injection stops, structural, residual and dissolved, and say what the book's own shares leave out

The Pressure Limit Sets the Pace

A CO₂ storage project is reservoir simulation with the goal flipped from extraction to permanence, and this capstone runs one in the Ogbon field to ask what sets its pace. The lesson is that the pressure limit, not the pore volume, sets the rate and the years. The oil's pore volume holds 12.37 Mt of CO₂ (Mt are metric tonnes), but the crest of the structure may not rise past a limit set below the minimum horizontal stress, so after the first year the project injects 0.423 Mt a year, not the 1.00 Mt a year planned, and fills in 29 years, not the 12.4 years the plan assumed.

The project is the book's own, the book's analogue of a storage project and not a design: the Ogbon field has no CO₂ source, no caprock test and no stress measurement. The planned 1.00 Mt a year, the margin of 10 % below the minimum horizontal stress and the producer kept on to withdraw brine at the flood's rate, 10,000 rb/d, are the book's own choices, and a real project would measure or design each of them.

At a planned 1.00 Mt a year and a margin of 10 % below the minimum horizontalstress, the crest's pressure limit is 3379 psia, so the project injects 0.423 Mt ayear after the first year and fills the oil's pore volume, 12.37 Mt, in 29 years,not the 12.4 years the plan assumed.(a) The pressure and its limit01020304050150020002500300035004000Years from the start of injectionpsiastressmeancrestlimit(b) The mass injected each year0102030405000.511.52Years from the start of injectionMt a yearplanheld(c) The CO₂ stored and the capacity010203040500481216Years from the start of injectionMtspilloil's pvstored(d) Where the CO₂ is held101001,00010,0000255075100Years after injection stops% of the CO₂dissolvedresidualstructuralKey: (a) the pressure at the crest (dark) and the field's mean (blue), the minimum horizontal stress atthe crest (black) and the limit below it (orange, dashed); (b) the mass injected each year, dark in ayear the plan is cut, with the plan (dashed) and the rate the limit holds (orange); (c) the cumulativeCO₂ (orange), the oil's pore volume (dark), the larger capacity above the spill point (dotted) and theplan (dashed); (d) the shares held structurally (blue), residually (orange) and dissolved (green) afterinjection stops, on a log axis.Crest pressure at the start 2751 psia (at the crest, 5539 ft deep; the field's mean is 3081 psia, afterthe flood raised it (Section 13.4)). Pressure limit 3379 psia (the minimum horizontal stress at thecrest, 3755 psia, less a margin of 10 %; the headroom is 628 psi). Rate the limit holds 0.423 Mt a year(held from the first year at the limit: the CO2's density at the limit times the brine withdrawn; theplan is 1.00 Mt a year). Capacity 12.37 Mt (the oil's pore volume at the start pressure; 14.39 Mt abovethe spill point, the upper bound). Trapped at 10,000 years 51.7 % structural (36.6 % residual and 11.7 %dissolved at 10,000 years; the brine holds 1.45 Mt at most). Years to fill 29 years (to inject 12.37 Mt;the plan alone would take 12.4 years).

Where the Project Starts

The project starts when the 30-year waterflood stops, at the pressure the flood leaves: the field's mean pressure is 3081 psia and the crest, 5539 ft deep, stands at 2751 psia. The flood raised the pressure of every cell (Section 13.4), so the CO₂ goes into a reservoir that the flood has already pressurised. The field is a closed tank of the flow grid's pore volume with its total compressibility and no aquifer, the book's own simplification. Each year the CO₂'s volume in the reservoir, at its density (Span and Wagner's equation of state, in the book's CO₂ kernel) at the field's mean pressure, or at the limit's pressure in a year the limit cuts the plan, where the crest is then held, less the brine the producer withdraws changes the pressure by that volume over the pore volume times the compressibility, the same at every cell.

The Limit and the Rate It Holds

The limit is the minimum horizontal stress at the crest, 3755 psia from the Geomechanics kernel's canon gradient (the book's stress state, not a measurement of the Ogbon field), less a margin of 10 %: 3379 psia. The crest starts at 2751 psia, so the headroom is 628 psi, and the plan's first year would spend all of it and more, so the first year is cut to 0.646 Mt. From then the crest sits on the limit and the pressure no longer changes, which fixes the rate: the CO₂ injected each year must fill no more reservoir volume than the brine withdrawn, so the rate is the brine's volume times the CO₂'s density at the limit, 729 kilograms per cubic metre, 0.423 Mt a year. The plan has no say in it.

Move the plan and the years do not move. At 0.50 Mt a year the limit binds from year 3 and the project fills in 29 years; at 2.00 Mt a year it binds from the first year and fills in 29 years. Only a plan below the rate the limit holds leaves the limit unused: at 0.25 Mt a year the crest's pressure falls to 1567 psia, because the producer withdraws more reservoir volume than the CO₂ fills, and the pore volume sets the years, 49.5 of them, 50 by the calendar. The margin moves the limit, but little: with none the limit is 3755 psia, the rate 0.436 Mt a year and the years 28; at 20 % the limit is 3004 psia, the rate 0.400 Mt a year and the years 31.

Which Capacity

Two capacities appear, and they are not the same CO₂. The oil's pore volume at the start pressure, 12.37 Mt, is what the project fills, and injection stops there, in year 29, after 0.295 Mt in the last year. The pore volume above the spill point, 14.39 Mt, is larger and is only the upper bound the book's CO₂ kernel reports: it is not what the project injects.

Trapping After Injection Stops

After injection stops the CO₂ keeps moving toward security (Section 13.5). By 10,000 years 51.7 % is held structurally, 36.6 % residually and 11.7 % dissolved. The shares are the book's own: the residual share is Land's trapping (Section 9.6) with the largest residual CO₂ saturation, 0.30 of the pore space; the dissolved share is limited to what the brine the plume contacts can hold, 1.45 Mt of the 12.37 Mt, at a solubility of 0.035 kg of CO₂ per kg of brine, a round value with no solubility model read; and there is no mineral trapping in them. They are taken at the field's mean pressure when injection stops, 3709 psia at the book's plan, and that pressure moves them a little: the slow plan of 0.25 Mt a year ends at a lower pressure and holds 48.7 % structurally and 14.8 % dissolved.

What a Real Project Would Change

A real project would replace each of the book's own choices with a measurement or a design: a leak-off test for the minimum horizontal stress at the crest, a seal and fault assessment for the margin, a boundary or an aquifer that relieves pressure (an open boundary would raise the rate the limit holds, because the tank would no longer be closed), and a source and a pipeline for the CO₂. The lesson would hold: the rate follows the pressure the seal can take and the brine that can be removed or displaced, and the pore volume only sets how much.

References

  • Span, R. and Wagner, W. (1996). A new equation of state for carbon dioxide covering the fluid region from the triple-point temperature to 1100 K at pressures up to 800 MPa. Journal of Physical and Chemical Reference Data, 25(6), 1509-1596. Used through the book's CO₂ kernel (co2-core), whose header gives it; the paper itself was not read.
  • Land, C. S. (1968). Calculation of imbibition relative permeability for two- and three-phase flow from rock properties. SPE Journal, 8(2), 149-156. doi:10.2118/1942-PA. Used through Section 9.6's trapping; not read for this section.