Reading the Simulation Output

Chapter 12, Running a Simulation, History Matching, and Forecasting

Learning objectives

  • Read the rates, cuts and pressures of a run, and say which physical fact each curve states and which it hides
  • Show that in an incompressible flood the oil rate is the water cut read again, and what the pressures say about depletion
  • Split a well's output by the beds it is open to, and tell a bed's share of the water from its recovery
  • Set an economic limit and read the year it is reached and the oil produced by then

A Run Is Read Through Its Curves

A simulation hands back no answer, only curves: for each well, the rates of oil and water, the water cut and the flowing pressure, and for the field what has been produced. Reading a run is knowing which physical fact each curve states and which it hides. The Ogbon field has no production, so the curves here are the model's forecast, not a history; Section 12.5 matches a model to a synthetic history.

The case is the book's flood of the Ogbon field in the 2450 cells of its flow grid, the one Section 11.4 measured: an injector 5 columns down the dip of Ogbon-1, open in all four beds at 10,000 rb/d, and Ogbon-1 producing at a held bottom-hole pressure, 2736 psia, the initial pressure of its top completion. The cells hold 92.8 million stb, the grid's oil, not the field equation's 91.0 million stb, for the reason Section 10.7 gives. The solver is the fully implicit one of Section 12.1 at a step of one year, 60 Newton iterations in all for the 10 years, and both balances close: the water to 1.0×10−151.0 \times 10^{-15} of the water injected and the oil to 3.6×10−163.6 \times 10^{-16} of it. Reading begins there, with a run whose books balance.

In year 5 Ogbon-1, the only producer, makes 3616 stb/d of oil and 5661 rb/d ofwater, a cut of 57 %. The injector holds 10 000 rb/d, and the flood isincompressible, so the well's liquid is fixed and the oil rate is the water cut readagain. The main sand takes 67 % of the water in and gives 88 % of the water out. Anoil rate of 3500 stb/d is reached in year 5.4, with 8.4 million stb produced, 9 % ofthe flow grid's oil.(a) Oil rate, stb/d0246810010002000300040005000Years of injectionwellmain sandupper sandshaly sandtight limestone(b) Water cut, %02468100255075100Years of injectionmain sandwellupper sandshaly sandtight limestone(c) Oil recovered, % of the oil in place024681001530Years of injectionupper sandwellmain sandshaly sandtight limestone(d) Flowing pressures, psia0246810270029003100Years of injectioninjectorgrid meanOgbon-1Key: the well (black, thick) and its beds, upper oil sand (blue), shaly oil sand (red, long-dashed),tight limestone (grey, dashed), main sand (brown); the economic limit (orange, dashed) and the year itis reached; the year read (black, dotted); in (d) the injector (orange), Ogbon-1 (black), held, and thegrid's pore-volume mean (grey, dashed).Oil rate 3616 stb/d (down from 4984 stb/d in year 1). Water cut 57 % (the main sand's is 75 %). Oilproduced so far 7.9 million stb (9 % of the grid's 92.8 million stb). Injector above Ogbon-1 404 psi(injector 3140 psia, Ogbon-1 held at 2736 psia). Oil produced to the limit 8.4 million stb (to year 5.4,at 3500 stb/d; 9 % of the grid's oil).

The Oil Rate Is the Water Cut Read Again

The flood is incompressible, so what the injector puts in the field takes out: Ogbon-1's liquid, its oil in reservoir barrels and its water, is the injector's 10,000 rb/d in every year. With the water cut fwf_w the water's share of that liquid, in reservoir barrels, and BoB_o the barrel's shrinkage, 1.20,

qo Bo=(1−fw) qinj.q_o\,B_o = (1 - f_w)\,q_{inj}.

The oil rate falls from 4984 stb/d in year 1 to 2602 stb/d in year 10 because the cut rises from 40 % to 69 %: the two curves are one curve. A decline that is read as a tank running down would mislead here. The pressures say so: the injector's flowing pressure rises from 3114 psia to 3149 psia, the grid's pore-volume mean from 3026 psia to 3069 psia, and Ogbon-1's is held. The pressure difference that drives the flood grows from 379 psi to 414 psi for the same rate. The water that replaces the oil is the less mobile fluid (the end-point mobility ratio is 0.43, Section 11.2), so each year's flood needs a little more pressure; a rising injection pressure at a constant rate reads as a favourable displacement, not as damage. The model is incompressible by the kernel's choice: in a model with compressible fluids the liquid rate would not be fixed by the injector, and a decline could be depletion.

The Well and Its Beds

Ogbon-1 is open in one cell of each bed, so its curves are sums over the beds, and the sum hides where each fluid comes from. In year 1 the well's cut is 40 % and the main sand makes 100 % of its water, at a cut of its own of 65 %, while each of the other three beds cuts under 1 %. By year 10 the cuts of the upper oil sand, the shaly oil sand, the tight limestone and the main sand are 46 %, 31 %, 2 % and 81 %. The well's cut is the flow-weighted mean of its beds': it says that water has arrived, not in which bed.

The injector's water goes the same uneven way: the main sand takes 62 % of it in year 1 and 69 % in year 10. Yet the largest bed is not the best swept. The main sand holds 39 % of the grid's oil and by year 10 has given up 14 % of it, against 21 % for the upper oil sand, 11 % for the shaly oil sand and 2 % for the tight limestone; the grid as a whole has recovered 14 %, 13.3 million stb. A bed's recovery here is the oil that has left it, which is the water that has come in to take its place, summed over its cells.

The Economic Limit

A flood stops when its operator stops it, and the book has no prices or costs, so the limit in the figure is yours: an oil rate below which the well is not worth running. At 3500 stb/d the oil rate is reached in year 5.4, with 8.4 million stb produced, 9 % of the grid's oil; at 4750 stb/d in year 2.0 with 3.6 million stb; at 2750 stb/d in year 9.0 with 12.4 million stb. The years are joined linearly between the end-of-year reports, and the limits run only over the rates the 10 years cover. Each leaves oil in the ground, 89.2 million stb at the highest limit: it is the limit, which is the economics, and not the reservoir running dry that ends a flood.

Reading It Right

Three habits keep a reading honest. Look at the units: oil is in stock-tank barrels, water and liquid in reservoir barrels, and the cut here is in reservoir barrels, so a cut computed from stock-tank rates would differ. Read the curves together: a rate against the cut, a pressure against the rate it carries. And ask what the model holds fixed: here the injector's rate, Ogbon-1's pressure and the incompressibility of the fluids, each of which shapes the curves before the reservoir does. Section 12.1 and Section 12.2 show what the solver and its step add to them: a step of one year is 62 times IMPES's stable step of 5.9 days, and costs a little accuracy, 14.33 % of the grid's oil recovered in 10 years against IMPES's 14.52 %.

This page is prerendered for SEO and accessibility. The interactive widgets above hydrate on JavaScript load.